Home > Custom Car Kits >

1961-1969 Lincoln Continental Analog 12V DC Valves Full FBSS Kit
Complete Air Suspension Kit for Lincoln Continental 1961-1969


 
Alternative Views:


List Price: $2,245.20
Our Price: $2,095.41
Savings: $149.79



Availability:: Usually Ships in 1 to 2 Days
Product Code: 10-6169CONTI
Qty:

Description
 

Complete Air Suspension Kit for Lincoln Continental 1961-1969. Kit will come with 8 12V DC 1/2" Valves.

***Kit Comes with following items***

Track tested, Show Stopper Air Suspension Kit! Don't settle for less! Check out our Gallery.

F.B.S.S. SYSTEM INCLUDE

2 VIAIR 444C, 200 PSI, 100% DUTY CYCLE (Compressors may be Black OR Chrome)
1 200 PSI PRESSURE SWITCH
1 Heavy Duty 80 AMP Relay
2 Airhouse 2 Bags 8.5" High
2 Double Play 11" High
1 Set of Front & Rear Bag Brackets
8 1/2" ASCO Valves
1 7 Switch Box full FBSS
1 Nickel Plated Brass PTC & Heavy Duty Brass Pipe Thread Fittings
1 5 Gallon Slim 6 3/8" NPT Port & 1 1/4" NPT Drain Port Steel Tank
1 Air Suspension Install kit (Nuts, Teflon Tape, Fuse & Fuse holder, Tubing Cutter etc.)

Bracket Installation Instructions:

Front Side:-

1. Remove front Shocks and the spring.

2. Bolt 3” long 3 hole rectangular plate on left and right side.

3. Bolt 5” tall all thread cups on top. Left and right side into the center hole of 3” rectangular plate.

4. Bolt the 2” tall cups by drilling holes in the A-Arm and then bolt the bag (Single Bellow Air House-2) between the upper and lower cups.

5. You will have to make the mounts for shock relocation, in this case they will be bolted from outside A- Arms due to space limitations.


Rear Side:-

1. Remove 3-4 Main Leaf Springs.

2. Leave one OR two leaf springs. Use a 3” or 4” Block to bolt the axle back to Leaf springs with U Bolts.

3. Weld 8” X 10” X 3/16” Thick plate in the center of axle on top side with uni-body

4. Weld big u-Shape Plates with triangular gussets on top side where the plate is welded to uni-body frame. Make sure to center these plates with the center of axle as well as bottom axle pad brackets.

5. Weld axle pad over the axle with center to the top U-shape plates on each side.

6. Bolt double bellow bags on the top of axle pad as well as u-shape plates.




Share your knowledge of this product. Be the first to write a review »